Project Description:
Project work at the Greenleaf Center began with the demolition of the Exterior Insulation Finishing System, which included the removal of gypsum, gutters, and insulation. We then installed new insulation, Densglas sheathing, and a hard coat stucco finish. Moving to the interior, we demolished framing, walls, ceilings, and flooring where required and installed new framing, drywall, FRP, ceilings, and paint.
Client:
Greenleaf Center
Architects:
Stengel-Hill Architecture
Engineers:
Skyhook Structural Engineering, P.C.